16
Nov

Sodexo UK (Swindon) Ltd

The project at Royal Grammar School moves forward with a sudden rush for the house lighting system with a temporary control system in order that all the trades can safely complete their works in the theatre. Not something that was in the programmed schedule but as always we were accommodating and found a solution. The second fix stage engineering works were also completed with the suspension of Triple E Unirail and Triple Erail curtain tracks along with an interesting product the SWA02 Tracking swivel arm with brake.

This month we also commenced works at one of our new clients Sodexo UK (Swindon) Ltd which was recommended from Sodexo UK (Exeter) Ltd. However in order to meet their requirements we decided to work after the end of the school day until the site caretakers locked up around midnight. This took some meticulous planning especially where we had to access two sites in an evening, however all went to plan and in a week we managed to service the stage lighting installations at Abbey Park School, Nova Hreod School, Red Oaks School, Moredon School, Orchid Vale, Brimble Hill School and we even repaired some equipment in a sensory room at Uplands School. Please contact us if you like us to undertake service work especially during term times as you see we will always try and be accommodating.