14
Sep

Site installation works Godfrey Brown Theatre

Work on site eventually ramps for us at the Royal Grammar School. We started with inspecting and testing the cabling installed by the electrical contractor and apart from a few areas where they were held up we were very impressed by the quality of the work completed by Whittaker Brothers Ltd. Site termination commenced with only the need for hand tools (as all soldering had been completed in the workshop and wired to spring terminals) meaning we raced through this part of the project. The M&E consultant from Engineering Services Design Practice (EDSP) stated ‘it was the neatest termination he had seen in many years and it was obvious we took pride in our work’